A commercial kitchen site survey should leave the next person with a usable record of the equipment, its route into the building, the conditions at its destination, and the questions still awaiting confirmation. A collection of unlabeled photos makes that handoff harder.
Use the checklist below as a planning template for a foodservice equipment project. Adapt it to the equipment and site. It records observations and open items; it does not establish code compliance, utility capacity, or authorization to install. Have qualified project personnel verify those matters against current manufacturer instructions and applicable local requirements.
1. Identify the project and the equipment
- Site address, room or area, survey date, and surveyor.
- Site contact, access arrangements, and permitted delivery hours.
- Equipment item number, manufacturer, model, and configuration.
- Current specification sheet and installation instructions, with revision or retrieval date.
- Equipment dimensions and weight, including the condition in which it will be moved: crated, uncrated, or with approved removable components.
- Existing equipment removal and disposal responsibilities, if applicable.
Label an unknown configuration as unresolved. Do not substitute the dimensions of a similar model.
2. Trace the complete delivery path
Follow the route from the unloading point to final placement. Record the measurements and restrictions that the delivery or installation team needs to assess the move.
- Truck approach, unloading location, dock or liftgate arrangements, and temporary staging space.
- Gates, door openings, thresholds, ramps, and changes in level.
- Corridors, corners, overhead restrictions, and the space available to turn.
- Elevators or lifts, including posted limits and any operating restrictions that require confirmation.
- Obstacles or existing equipment that must be moved, with a named owner for that work.
- Any need for a specialist delivery or rigging assessment.
Take an overview photo and a labeled detail at a tight point. Record where and how each measurement was taken. A doorway measurement alone does not prove that a unit can negotiate the approach or the turn beyond it.
3. Record the final equipment position
- Planned location and orientation, tied to an equipment number or marked drawing.
- Measured available space and nearby obstructions.
- Door swing, operator access, cleaning access, and service access to be checked against the equipment instructions.
- Floor condition, changes in level, and any support or anchoring questions for the responsible specialist.
- Adjacent equipment and work that must be complete before placement.
Distinguish a measured condition from a dimension copied from a drawing. Date both records and flag disagreements.
4. Capture utility information and assign verification
For each connection, record its location, visible identification, photographs, and the equipment requirement being checked. Use the current installation instructions as the equipment reference.
| Area | Information to capture | Confirmation to assign |
|---|---|---|
| Electrical | Visible labels, connection location, equipment supply requirements | Suitability and available capacity, checked by qualified personnel |
| Gas | Identified fuel type, connection and shutoff locations, equipment requirements | Supply suitability and any required changes |
| Water | Supply locations and documented equipment water requirements | Suitability, treatment needs, and required work |
| Drainage | Proposed connection location and relevant equipment instructions | Drainage arrangement and required work |
| Ventilation and suppression | Existing system identification and the proposed equipment arrangement | Compatibility, design review, and approvals as applicable |
Do not open energized equipment or operate utilities merely to complete this form. An observed connection is not proof that the required capacity or approval exists. Keep unverified items visible until the responsible person resolves them.
5. Build an open-items record
Give every unresolved question a location or equipment reference, supporting evidence, an owner, and a target response date. Suggested statuses are observed, reported but unverified, awaiting confirmation, and resolved with evidence.
A hypothetical entry might read: “Item 12, receiving corridor turn: route assessment pending. Photos A–C attached. Delivery contractor to confirm the handling plan before delivery is released.” That identifies the next action without claiming the move is feasible.
Keep the response and its source with the original question. Let the responsible project team decide which open items prevent ordering, delivery, or installation.
6. Check the handoff with its recipient
Before releasing the packet, ask a project manager or installer to locate the equipment, follow the documented route, and identify unresolved items using the record alone. Note what they still have to ask the surveyor.
Include the equipment list, labeled photos, marked layout, utility observations, and open-items record in a consistent package. Make its date and revision clear. Keep a record of later changes so the recipient can tell what has been updated.
Where KitchenReady fits
KitchenReady is AI Elevates' site-survey and installation-readiness application for foodservice equipment dealers. Its current public capabilities include guided checklists, measurements and utility details, photos, video and voice notes, and a printable survey report.
KitchenReady is in dealer testing. AI Elevates is not publishing customer counts or performance results for it yet. For your own evaluation, consider measuring missing-information counts, clarification requests, and whether the receiving team can use the survey record. Those are suggested pilot measures, not promised improvements.
Request KitchenReady dealer pilot access and describe how your team surveys commercial kitchens today.